The existing lead roof had developed splits and was leaking. We removed the old lead covering, replaced the boarding beneath and fitted a new lead roof with mop rolls and a welded collar around the pipe. These photographs show the roof before replacement and the completed leadwork.
Before↗Before replacement: the existing lead roof had developed splits and was leaking.After↗New lead covering with mop rolls, fitted over replacement boarding.After↗The replacement lead roof viewed from the opposite end, showing the mop rolls and pipe collar.Leadwork detail↗Close-up of a mop roll end and the leadwork dressed over the roof edge.Welded detail↗Close-up of the welded lead collar around the pipe, including the vertical seam and base weld.
Natural slate reroof and flat roof
We reroofed this property in natural slate and renewed the flat roof. These photographs show the roof before and after the work.
Before work↗Before the reroof: the existing slate roof and flat roof.After work↗The roof after reroofing in natural slate. The dormer window opening was still boarded when this photo was taken.After work↗The natural slate reroof and renewed flat roof, photographed together.
Chimney repairs, re-rendering, brickwork and flaunching.
Before↗Before the repairs: worn flaunching, damaged brickwork and open mortar joints.After↗We renewed the flaunching, rebuilt sections of brickwork, chased out the mortar joints and repointed the chimney. We also renewed the front apron and step flashings and applied Stormdry.Completed work↗New chimney flaunchingCompleted work↗The three-pot chimney at one end of the house. We rebuilt it down to the corbelled brickwork, re-rendered the whole chimney and painted it to match the house.Completed work↗The separate four-pot chimney at the opposite end of the same house, shown after the scaffolding was removed, with the finished rendering and paintwork to match the house.
Rendering repairs
The roof-level rendering before we started and after the repairs were completed.
Before↗The existing rendering at roof level before the repairs.After↗The repaired rendering at roof level after completion.
During work↗Dormer framework during constructionAfter↗Dormer after completion
Chimney leadwork
Leadwork around chimneys.
Leadwork detail↗Welded lead back gutter A lead back gutter formed to fit behind the chimney, with welded corners where it meets the side flashings.Leadwork detail↗Chimney flashing on a slate roofLeadwork detail↗Chimney flashing and slate roofingLeadwork detail↗Chimney back gutter and step flashings A lead back gutter fitted behind the chimney, with step flashings following the mortar joints along the side.Leadwork detail↗A second view of the chimney flashing, showing the leadwork along the side of the stack.
Lead welding & flashings
Close-up views of our leadwork around a brick chimney, showing welded joints, the apron across the front and stepped flashings along the sides.
Leadwork detail↗A lead apron shaped around the chimney base, with the corner joints welded.Leadwork detail↗Lead back gutter before pointing A made-to-measure lead back gutter fitted behind the chimney, with the mortar joints still to be pointed.Leadwork detail↗The lead apron across the front of the chimney and stepped flashings along the side.
Lead-lined valley replacement
Before, during and after the valley replacement, including preparation for the new leadwork and a close-up of the welded joint.
Before↗The original valley before replacement.During↗Timber boarding and underlay prepared for the new leadwork.After↗The completed lead-lined valley with the surrounding slates reinstated.After↗Close-up of the welded joint in the new leadwork.
Lead back gutter repairs & replacement
Leaking lead back gutters behind chimneys are a common cause of roof leaks and damp on internal walls. We’ve replaced our fair share over the years—from lead that has split at folds and bends to gutters damaged by squirrels gnawing through it. These photos show an old back gutter and its replacement with welded joints, alongside examples of squirrel damage.
Before↗The old lead back gutter exposed behind the chimney before replacement.New leadwork↗New lead back gutter with welded joints, before the roof tiles are reinstated.New leadwork↗A closer view of the new back gutter and welded corner joints.After↗The replacement back gutter with the surrounding roof tiles reinstated.After↗Another view of the completed lead back gutter behind the chimney.
Squirrel damage to leadwork
Squirrel damage↗Close-up of the gnawed lead edge, with the timber beneath exposed.Squirrel damage↗A wider view of the damaged lead back gutter behind the chimney.
Tile roofing, valleys & rooflights
Tiled roofing, lead valleys and rooflights.
During work↗Lead valley being fittedDuring work↗Valley leadwork during tilingAfter↗Finished tiled roof and rooflightsAfter↗Finished tiling around the valley
We converted this garage from a flat roof to a pitched roof. The finished photos show the tiled roof, hips and ridge from the front and garden side.
Before↗The original flat garage roof before we converted it to a pitched roof.After↗The garage after conversion, with the pitched roof tiled and the hips and ridge finished.After↗The completed garage roof from the garden, showing how the new pitched roof sits on the existing building.
Roof detail↗Lean-to roof felted, battened and tiled, with two VELUX roof windows and lead flashing fitted.During work↗Existing bitumen roof sheets replaced with new corrugated fibre cement sheeting, including a clear Perspex sheet to let natural light in.
Clay tiled roof with scalloped tiles and tile hanging
We fitted the clay tiled roof, including the scalloped feature tiles, and carried out the tile hanging on the gables and dormers. These photos show the roof details and the wider view of the house with scaffolding still in place.
Roof view↗Clay tiled roof and tile hanging on the gables and dormersRoof detail↗A closer view of the clay roof tiles, with scalloped feature tiles across the main roof and dormer.
These photos show the carport roof as we cut and pitched the rafters, followed by the finished roof with tiles, hips, ridge and guttering in place.
During work↗The carport during construction, with the roof timbers cut and pitched ready for the next stage.After↗The completed carport roof, with tiling, hips, ridge and guttering fitted.
Lean-to roof replacement
We replaced the glazed lean-to roof with a slate roof. The two photos show the original glazing and the completed replacement.
Before↗The existing glazed lean-to roof before replacement.After↗The lean-to after the glazed roof was replaced with slate.
Timber porches
Work carried out by LJD Roofing & Building.
Completed work↗We carried out the footings, built the dwarf walls, fitted coping stones and paved the path to the customer’s specification. The oak frame was subcontracted, and we supplied and fitted handmade roof tiles chosen to match the house.Completed work↗Open timber porch
Oak-framed project — from footings to finishing touches
We carried out this project from start to finish: the footings, dwarf walls, roof lanterns and oak frame to take the subcontracted oak glazing units. We also laid the paving to the customer’s specification.
The customers have since become good friends. To finish the project, we made them a table to match the oak in the room.
Completed work↗The completed oak-framed project, with glazing, dwarf walls, tiled roof and paving.Completed work↗The table we made for the customers to match the oak in their new room.